shreesaiurja2020@gmail.com Moradabad · Kolkata Monday – Saturday, 9am to 6pm
Get a quote
SSUL — India's Top Coal Expertise

India's Top Coal Expertise

Indian steam coal, delivered to the plant

Shree Sai Urja Limited supplies domestic steam coal — graded, sampled and moved by rail — to plants that already fire Indian GCV coal.

  • G4–G14GCV grades
  • 5Coalfields
  • 2008Incorporated

On the desk

GCV band, size and the siding

Choose a coalfield and a GCV band. Add the size, the tonnes and the plant or siding. The figures beside it are the typical range for that band.

Coal stockyard
G4–G14Indian non-coking grades, plus washed coal
About SSUL

The group's Indian coal company

Shree Sai Urja Limited was incorporated in 2008 to supply Indian coal. The business is wholesale trading of domestic steam coal, not imported cargo.

KCCL, our sister company, brings in foreign-origin steam coal and met coke. SSUL stays with Indian coalfields: the GCV grade a plant already fires, in ROM, steam or slack, moved by rail and road to the gate. The same group, two different coals, so a buyer is not asked to treat them as one product.

  • GCV grades buyers already use
  • Sampling before the rake moves
  • Rail dispatch and siding handling
  • Delivery matched to the plant
About the company
How a rake is delivered

Sampling, rail and the road leg

Coal is sampled against the order, loaded, and moved by rail to the siding, then by road to the plant.

1

Coalfield sourcing

Non-coking coal from Singrauli, Korba, Talcher, the eastern belt and Wardha–Godavari, plus washed coal when ash has to come down.

2

Grade check

GCV, moisture and ash checked against the order before we treat a rake as ready.

3

Rail and road

Rake to the serving siding, then road to the plant. Weighment and shortfall are part of the same job.

4

Plant-gate delivery

Quantity, size and timing agreed up front, so the boiler house is not guessing what will arrive.

View coal grades

Indian coalfields

From the mine belt to Moradabad

Steam coal moves by rail from Singrauli, Korba, Talcher, Raniganj and Chandrapur. SSUL coordinates sampling, rake dispatch and the road leg to your plant. Washed coal is prepared from these same fields.

Indian coal routes to Moradabad Rail routes from Singrauli, Korba, Talcher, Raniganj and Chandrapur to the SSUL desk at Moradabad. Raniganj Singrauli Korba Talcher Chandrapur Moradabad · SSUL

SSUL at a glance

2008Incorporated
5Coalfields on offer
29Listed GCV grades
6400Top of the G4 band, kcal/kg
Where the coal is fired

Plants we supply

Indian steam coal for captive power and for the process heat behind paper, textiles, sugar, cement, chemicals, brick and steel.

Captive Power

Paper

Textiles

Sugar

Cement

Chemicals

Brick & Kilns

Steel

The Moradabad desk

Grade, sampling, rail and price

Coal India GCV grades

Offers use Coal India GCV grades. The figure on the order is the band the plant already fires.

Sampling before dispatch

Heat value, ash and moisture are checked against the order. The rake report is the document that counts.

Rail, siding, plant gate

One desk follows the coal from loading to the road leg, including weighment.

Enquiries

Enquiries go to the Moradabad coal desk. Grade, size, quantity and location are enough to start.

Raw and washed

ROM, steam and slack from the coalfield, and washed coal when ash has to be lower.

Domestic quotation

The quote uses the Indian grade and the logistics to the plant named in the enquiry.

SSUL

How an order is written

An order names the grade, the size and the siding. Sampling, weighment and the delivery window are part of that order.

Read about the company

Need Indian coal at your plant gate?

Share the GCV grade, size, quantity and delivery location. The desk will come back with availability and a price.

Grades Email Get a quote